ELECTRIC VEHICLES & HYBRID / WORKSHOP TOOL

EV Trip Cost Calculator

Budget replenishment of all trip energy at the supplied tariff mix; stop count is an energy-equivalent count.

Electricity replenishment trip cost62.00 USDDetails ↓
01

Your inputs

EDIT TO RECALCULATE
mi

kWh/100 mi

%

%

USD/kWh

USD/kWh

USD

kWh

%

02

Your result

Electricity replenishment trip cost
62.00USD
EV Road Trip — full-replenishment-equivalent charging stops
5.000 stops
Trip battery energy
150.000 kWh
Trip grid energy
166.667 kWh

Budget replenishment of all trip energy at the supplied tariff mix; stop count is an energy-equivalent count.

  • The stop count does not subtract departure energy or plan charger locations. Detours, queueing, curve taper and arrival reserve need a route plan.
  • Example values demonstrate arithmetic. Use measurements, component specifications and applicable requirements for your actual vehicle.

Formula and method

Budget replenishment of all trip energy at the supplied tariff mix; stop count is an energy-equivalent count.

Cost = distance × battery use per mile / charging efficiency × weighted tariff + fees

Replenishment-equivalent stops = ceiling(trip battery energy / energy per stop)

Understanding your inputs

Trip distance
Enter mi. Accepted input range: 0.000001–1000000.
Battery consumption
Enter kWh/100 mi. Accepted input range: 0.000001–200.
Charging efficiency
Enter %. Accepted input range: 0.000001–100.
Share of replenishment energy at public tariff
Enter %. Accepted input range: 0–100.
Home tariff
Enter USD/kWh. Accepted input range: 0–10.
Public tariff
Enter USD/kWh. Accepted input range: 0–10.
Total quoted trip session fees
Enter USD. Accepted input range: 0–1000000000.
Usable battery capacity
Enter kWh. Accepted input range: 0.000001–1000000.
Energy per stop as fraction of usable capacity
Enter %. Accepted input range: 0.000001–100.

Worked example

Example inputs: Trip distance: 500 mi; Battery consumption: 30 kWh/100 mi; Charging efficiency: 90 %; Share of replenishment energy at public tariff: 60 %; Home tariff: 0.18 USD/kWh; Public tariff: 0.45 USD/kWh; Total quoted trip session fees: 5 USD; Usable battery capacity: 60 kWh; Energy per stop as fraction of usable capacity: 60 %. Electricity replenishment trip cost: 62.00 USD. Independent companion modules use their separately labelled inputs.

Example inputs
Trip distance
500 mi
Battery consumption
30 kWh/100 mi
Charging efficiency
90 %
Share of replenishment energy at public tariff
60 %
Home tariff
0.18 USD/kWh
Public tariff
0.45 USD/kWh
Total quoted trip session fees
5 USD
Usable battery capacity
60 kWh
Energy per stop as fraction of usable capacity
60 %

Default result: Electricity replenishment trip cost: 62.00 USD.

Assumptions

  • Use consistent units and measurements from the same operating point.
  • Displayed example quantities demonstrate arithmetic and are not prescriptions.

Limitations

  • The stop count does not subtract departure energy or plan charger locations. Detours, queueing, curve taper and arrival reserve need a route plan.

Common mistakes

  • Entering an outside dimension when the field requires a pitch, internal or effective dimension.
  • Treating supplied rates, coefficients, quotes or appraisals as a live database.
  • The stop count does not subtract departure energy or plan charger locations. Detours, queueing, curve taper and arrival reserve need a route plan.

Sources and methodology

Method reviewed October 1, 2026. Formulas are implemented independently; references explain the dimensions, ratings or application requirements.

  • US EPA — automotive efficiency reporting ↗

    MPGe compares energy with a gasoline-equivalent energy quantity; this implementation explicitly rounds that quantity to 33.7 kWh. Grid/battery energy boundaries, prices and loss fractions are declared inputs.

  • NIST — SI conversion factors ↗

    Declared mechanical horsepower, length, mass, volume and pressure unit conversions; dimensional calculations are derived independently.

Frequently asked questions

What does this ev trip cost result represent?

Budget replenishment of all trip energy at the supplied tariff mix; stop count is an energy-equivalent count.

Which application limits should I check?

The stop count does not subtract departure energy or plan charger locations. Detours, queueing, curve taper and arrival reserve need a route plan.

Can I reuse the displayed example as a specification?

Use the example to understand the arithmetic. Replace all assumptions with measurements, applicable manufacturer specifications or current transaction quotes.