INTAKE, EXHAUST, FUEL DELIVERY & TUNING / WORKSHOP TOOL

Race Fuel Calculator

Budget a race session from measured consumption and lap time; compare usable tank capacity with the same reserve convention.

Race fuel including reserve5.867 US galDetails ↓
01

Your inputs

EDIT TO RECALCULATE
laps

min

US gal/h

%

US gal

02

Your result

Race fuel including reserve
5.867US gal
Race Fuel Stint — usable laps before reserve
40.909 laps
Track Lap Fuel — measured rate per lap
0.267 US gal/lap
Scheduled running time
40.000 min

Budget a race session from measured consumption and lap time; compare usable tank capacity with the same reserve convention.

  • Pit idling, formation laps, cautions and fuel pickup limits need separate allowances. A tank rating is not its usable volume.
  • Example values demonstrate arithmetic. Use measurements, component specifications and applicable requirements for your actual vehicle.

Formula and method

Budget a race session from measured consumption and lap time; compare usable tank capacity with the same reserve convention.

Vlap = burn per hour × lap minutes / 60

Vtotal = laps × Vlap × (1 + reserve/100)

Understanding your inputs

Planned laps
Enter laps. Accepted input range: 0.000001–10000.
Average lap time
Enter min. Accepted input range: 0.000001–100.
Measured fuel burn
Enter US gal/h. Accepted input range: 0.000001–1000.
Reserve allowance
Enter %. Accepted input range: 0–100.
Usable tank volume
Enter US gal. Accepted input range: 0.000001–1000.

Worked example

Example inputs: Planned laps: 20 laps; Average lap time: 2 min; Measured fuel burn: 8 US gal/h; Reserve allowance: 10 %; Usable tank volume: 12 US gal. Race fuel including reserve: 5.867 US gal. Independent companion modules use their separately labelled inputs.

Example inputs
Planned laps
20 laps
Average lap time
2 min
Measured fuel burn
8 US gal/h
Reserve allowance
10 %
Usable tank volume
12 US gal

Default result: Race fuel including reserve: 5.867 US gal.

Assumptions

  • Use consistent units and measurements from the same operating point.
  • Displayed example quantities demonstrate arithmetic and are not prescriptions.

Limitations

  • Pit idling, formation laps, cautions and fuel pickup limits need separate allowances. A tank rating is not its usable volume.

Common mistakes

  • Entering an outside dimension when the field requires a pitch, internal or effective dimension.
  • Treating supplied rates, coefficients, quotes or appraisals as a live database.
  • Pit idling, formation laps, cautions and fuel pickup limits need separate allowances. A tank rating is not its usable volume.

Sources and methodology

Method reviewed October 1, 2026. Formulas are implemented independently; references explain the dimensions, ratings or application requirements.

Frequently asked questions

What does this race fuel result represent?

Budget a race session from measured consumption and lap time; compare usable tank capacity with the same reserve convention.

Which application limits should I check?

Pit idling, formation laps, cautions and fuel pickup limits need separate allowances. A tank rating is not its usable volume.

Can I reuse the displayed example as a specification?

Use the example to understand the arithmetic. Replace all assumptions with measurements, applicable manufacturer specifications or current transaction quotes.