Formula and method
Apply the supplied repair quote structure to inspected repairable dents.
PDR estimate = repairable count × quoted base price × documented multiplier + access cost
Understanding your inputs
- Repairable PDR dent count
- Enter count, as a whole number. Accepted input range: 0–1000.
- Quoted base amount per dent
- Enter USD. Accepted input range: 0–1000000000.
- Documented quote complexity multiplier
- Enter factor. Accepted input range: 0.000001–10.
- Quoted access/disassembly charge
- Enter USD. Accepted input range: 0–1000000000.
Worked example
Example inputs: Repairable PDR dent count: 4 count; Quoted base amount per dent: 100 USD; Documented quote complexity multiplier: 1.2 factor; Quoted access/disassembly charge: 80 USD. Supplied paintless-dent-repair estimate: 560.00 USD. Independent companion modules use their separately labelled inputs.
Example inputs
- Repairable PDR dent count
- 4 count
- Quoted base amount per dent
- 100 USD
- Documented quote complexity multiplier
- 1.2 factor
- Quoted access/disassembly charge
- 80 USD
Default result: Supplied paintless-dent-repair estimate: 560.00 USD.
Assumptions
- Use consistent units and measurements from the same operating point.
- Displayed example quantities demonstrate arithmetic and are not prescriptions.
Limitations
- Example prices and multiplier are assumptions. Paint integrity, dent depth, edges and panel material determine feasibility.
Common mistakes
- Entering an outside dimension when the field requires a pitch, internal or effective dimension.
- Treating supplied rates, coefficients, quotes or appraisals as a live database.
- Example prices and multiplier are assumptions. Paint integrity, dent depth, edges and panel material determine feasibility.
Sources and methodology
Method reviewed October 1, 2026. Formulas are implemented independently; references explain the dimensions, ratings or application requirements.
- NIST — SI conversion factors ↗
Declared mechanical horsepower, length, mass, volume and pressure unit conversions; dimensional calculations are derived independently.
Frequently asked questions
What does this pdr result represent?
Apply the supplied repair quote structure to inspected repairable dents.
Which application limits should I check?
Example prices and multiplier are assumptions. Paint integrity, dent depth, edges and panel material determine feasibility.
Can I reuse the displayed example as a specification?
Use the example to understand the arithmetic. Replace all assumptions with measurements, applicable manufacturer specifications or current transaction quotes.